News
How to effectively reduce the cost of asphalt mixing plant?
September 30, 2022
As the asphalt mixing plant is an important production equipment in road construction, it occupies an indispensable position in the construction. However, in recent years, the market competition of road facilities has become increasingly fierce. In order to obtain more profits It is necessary to effectively reduce the cost. The following editor will briefly introduce how the asphalt mixing plant should reduce the cost.
1. Improve power quality

Since the asphalt mixing plant will use electric energy when it is working, the quality of the electric energy directly determines the operation of the mixing plant. If you want to improve the electric energy of the mixing station, you can reduce it by determining the distribution voltage, improving the power factor, reducing the line loss, and stopping the transformer to cut off the high voltage.

LB2

2. Use fuel instead of diesel
Due to the increasingly fierce market competition, reducing the cost of asphalt mixing plants has become the goal that many companies want to achieve. Among the many costs, the cost of fuel is the cost of fuel. In the process of asphalt mixing and heating, it is necessary to use fuel. For energy supplementation, low-cost fuel, oil residue, oil, gas, etc. can be used to replace traditional diesel oil, so that the cost of fuel can be well controlled.
Since the main energy consumption of asphalt mixing plant is oil and electricity, if you want to effectively reduce costs, you can reduce costs on the basis of oil and electricity consumption. As long as you grasp the cost of these two aspects, you can make The overall cost is effectively controlled, thereby reducing the cost of the cost, so that the economic benefits of the enterprise can be improved.